case study

Veterinary Practice, Cambourne

Ambient Engineering Solutions Engineer fixing a rooftop air conditioning unit

PROJECT INFO

Project Type
Boiler decarbinisation & ASHP Installation

Project Value

~£42k

Client Specification

Decommissioning of boilers on site and replace with ASHP solution.

Solution

Decommission and remove existing Gas Boiler. Install x2 14kw ASHP Monoblocs to Bin Store. Install pipework, pumps, buffer and ancillaries. Install controls, and interface enables into existing UFH systems. Carry out electrical installation to suit. Flush system and introduce Propylene Glycol anti-freeze. Fill and Vent system, and commission flow rates. Manufacturer commissioning and demonstration performance.

Customer Feedback

Another quality installation carried out by Ambient Engineering – Worked to a budget to provide a green solution replacing a gas boiler with ASHP technology.

Following successful delivery of this project, Ambient have been chosen to identify sites on the client's estate whereby ASHP would be suitable, provide budget costings for 2025 replacements.

Learn how Ambient can bring value to your business.

Scroll to Top